VISFO Product/Cross-functional

Asset Decision Hub

Early-asset portfolio, TPP variants and Go/No-Go gates in one place.

Cross-functional

Shortlist it, send it over — we come back with the shape we'd actually recommend.

What it is

What asset decision hub actually is.

The decision surface for the early-asset portfolio. Each candidate sits in the hub with its development scenarios, TPP variants, Go/No-Go evidence packages and investment case, tracked through every gate rather than reconstructed for each committee.

Built for portfolio and BD leads who run the gate review rather than only attend it. The artefact is decision continuity across committees, not a fresh slide deck per cycle.

What you get
  • Portfolio view of candidates with status per gate
  • TPP variants and Go/No-Go evidence package per candidate
  • Investment case and access risk register
  • Decision log of every gate move with rationale
  • Next-decision queue for the portfolio leadership
Build a scope of work

Add the pieces you'd want and we'll build a shortlist you can review, reorder and send over. No pricing wall, no commitment — we come back with what we'd actually recommend, including anything you don't need.

How it works

Approach, modules, delivery.

Move through the tabs to see how the work runs, what it's made of and what lands at the end.

Inputs

  • Early-asset portfolio with mechanism, indication, modality and stage
  • TPP variants per asset (min / target / aspirational) and their evidentiary deltas
  • Stage-gate criteria (TRD, PoC, PoM, Go/No-Go) with the evidence and threshold for each
  • Investment case per asset (eNPV, time-to-decision, capital at risk, real-option value)
  • Competitive and regulatory context routed in from Signal Watch and Regulatory Intelligence Hub

Method

Asset Decision Hub is the surface where early-asset decisions are made and defended. The portfolio sits on one canvas, every asset with its current stage, the next gate, the gating evidence, the TPP variant that is in play, and the investment case behind it. Gate decisions are framed as evidence-against-threshold and the decision memo is generated from the same data the committee sees. Scenarios run on the same model, so a kill, a re-scope or a re-prioritisation can be tested before it is taken to committee. The hub writes into TPP Studio, Model Studio, Forecasting Studio, Evidence Gap Console and the Founders Decision Log so the decision is operational, not a slide.

Assumptions

  • Stage-gate criteria are written down and agreed at the portfolio level, not invented at the meeting.
  • Each asset has a current TPP variant in TPP Studio that the hub can reference.
  • Investment-case assumptions are versioned and refreshable when the forecast or model updates.

Limitations

  • Early-asset eNPVs carry wide uncertainty, the hub presents bands, not point estimates.
  • A hub cannot substitute for committee judgment; it makes the basis for the call explicit.
  • Real-option value depends on credible decision points downstream, if those are vague, the option premium is too.
Scope builder

Think this belongs in your scope?

Add it alongside anything else that fits, then send the shortlist over. We'll reply with the shape we'd recommend — sequence included, and the parts we think you can skip.

Build what comes next.

Whether you need growth, answers or capability, VISFO helps you move earlier and faster.